Most expensive installation mistakes start with a small assumption: the cut-out matches the model name, the driver will fit somewhere, the panel can always come out later. Before the ceiling is closed, all of that can still be checked without breaking anything. This is the checklist we would go through for any of our lamps.
1. One set of documents for everyone
The designer, the installer and whoever orders the lamps should work from the same model name, the same drawing and the same driver. Write the date or revision on the drawing. Our DWG drawings and PDF data sheets for every model are on the DWG and PDF files page. If two documents ever show different cut-out sizes or depths, write to us before cutting, not after.
2. The checklist
| Check | What to confirm | Our numbers |
|---|---|---|
| Cut-out | Size from the drawing of the model you actually ordered | LINEA: 1135 x 125 mm; others on the drawings |
| Space above the ceiling | Measured where the lamp goes, not somewhere else | FLAT panels 100 mm (50 mm in a grid ceiling), ZENITH at least 240 mm, LINEA 100 mm |
| Support | Who confirms the ceiling can carry the weight | The large FLAT windows weigh 20 to 30 kg; FLAT 60 x 60 cm weighs 5.2 kg |
| Clashes | Pipes, ducts, beams | Photograph the void before closing |
| Driver | Where it sits and how it will be reached | Write the location on the drawing |
| Control | Remote, app, DALI or 0-10 V for this exact model | Tuya and remote as standard, DALI versions, 0-10 V on the large FOCUS |
| Light | Direction and where people sit | FOCUS and ACCENT need the right orientation, not only the right spot |
3. Plan access for a repair years from now
Imagine the driver needs replacing in five years. Is its location written down? Can it be reached without moving furniture or cutting the ceiling? In a 600 x 600 grid ceiling the panel simply lifts out. In plasterboard, leave an access hatch near the lamp. A repair that needs demolition means days without using the room, which matters a lot in a rental.
4. Check the effect on site
Mark desks, seats and the bed on the plan. With FOCUS, the sun beam has a direction; with ACCENT, the light goes onto one wall from 0.6-1 m away. Try the position before the final finish makes changes expensive. A product photo is not a test of your room: the height, surfaces and viewpoint are different.
5. Test the controls before handover
Check brightness and colour temperature on the installed lamp with the installed driver. Then switch it off at the wall and on again, cut the power and restore it, and check what works without the internet. Write down how it behaves instead of assuming.
6. Close the open points
Before closing the ceiling, collect the photos, the final drawing, the result of the light test and the list of anything still unresolved, with a name next to each item. This is a coordination list, not wiring instructions: the electrical connection is the electrician's job.
Questions about a specific model? Write to us with the model name and the drawing you are working from. You can also see the lamps installed in our showroom at Taneczna 27 in Warsaw, open 24/7.